Legal Body for Gas Work
Promoting excellence in oil heating
Microgeneration Certificate Scheme
The official body of Solid Fuel Heating
The Renewable Energy Associations sponsored consumer assurance scheme
Examples of Past Work
Installation of a 90 kW Eta Wood Chip Boiler to heat a large house. The boiler was located in an old stable with adjacent wood chip store.
Installation of District Heating and Below Ground Transfer Pipe Work.
Installation of a 120kW CN Log boiler where access to the boiler room was gained by removing a window yet causing no lasting change to this listed building.
Installation of a 80kW wood chip boiler with log burning capabilities to heat the dormitory accommodation of a college.
Design and supply a bespoke portable wood chip loading conveyor.
Installation of a 15 kW wood pellet stove with internal boiler which was linked to a buffer vessel, together with the installation of solar panels to heat a low energy, newly built, oak framed house.
Installation of a 25 kW wood pellet boiler to heat a large modern newly built house.
Installation of a 40 kW CN wood chip boiler with an integral hopper and log burning capability, to heat a newly built industrial unit burning joinery waste.
Installation of a 80 kW CN log boiler and 3000 litre accumulator tank to heat a large 17th century country mansion.
Chimneys powder coated Matt Black to blend in with buildings.


